First to Market

FTM is an accelerated print to part process. Generally turn around time on a production capable tool is a minimum of 6 to 8 weeks. We can design and build production tooling in as little as 2 weeks and at a substantially reduced cost through the use of specially designed and engineered universal die sets. When you enroll your product in our FTM program your upfront capital investment is paying for internal tooling specific to your part. Because you are only paying for the internal tooling we are able to use the highest quality materials to build that tooling while maintaining a cost to you that is at or often well below that of our competitors.

Your internal tooling is than mated to our universal die components for the purposes of running production. Unlike prototype tools, FTM is capable of part production in the billions. As a matter of fact we produced 800,000,000 parts for Intel's Pentium IV chip with this platform and passed all of their quality standards with flying colors.

This technology is exclusive to K S Tooling and it is one of the things that sets us apart from anyone else in the industry. It is not simply a high tech tool. It is a system that starts in design and involves all departments through to part delivery.

Clients that take advantage of this platform are able to get to market faster and more competitively because of FTM. In addition, it is ideal for part modifications at any time but especially early in a program's life cycle. If you call us with a part change more often than not we are addressing it that day and are running the new parts the following day. The following is an example of how First To Market could benefit your company.

FIRST TO MARKET             TRADITIONAL
Prototype tooling cost = $12K  Prototype tooling cost =12K $
2-3 weeks prototype lead time 2-3 weeks prototype lead time
Production tooling cost = $0K Production tooling cost =$40K
0 weeks production lead time 6-8 weeks production lead time
Total tooling cost = $12K Total tooling cost = $52K
Total lead time to production capable tooling = 2-3 weeks Total lead time to production capable tooling = 8-11 weeks


Our first to market program
has revolutionized the metal stamping industry.

>> Click here to find out more.